Description
Avante – Kanjurmarg West, Mumbai, a dream home that elevates you to a connected lifestye you always aspired from the creators of iconic masterpiece. BKC (20 mins),SEEPZ(20 MINS) AND VIKHROLI(5MINS)A joint project by two of the biggest names in the industry. 3 stunning towers An enchanting view is a luxury even for the most extravagant homes in Mumbai. An ultra-luxury address in the heart of the city, with a view that can easily put many hill station resorts to shame. With an affluent neighborhood, and an equally opulent structure, this is one rare address where nature’s real beauty and the luxuries of modern living unite.
1, 1.5 /2 Bhk in Kanjurmarg at unbelievable price as the best New launch in Kanjurmarg. Far from the noise of the city, flat designs lets the fresh air enter into your home High-rise buildings of about 30+ storeys having exclusive 1, 1.5 and 2bhk approved apartments in Kanjurmarg with modern amenities.With an prosperous vicinity and an evenly languorous composition, its certainly one exceptional address in which nature’s legitimate magnificence and the amusement of fashionable living collaborate.
KEY SPECS
Total of 3 Towers – 2 Basements + Ground (Parking)
+ 7 Podiums (Parking) + Eco Deck + 28 Habitable floors. Total no of units: 460
Tower A
28 Floors consisting of 6 units on each floor – 3 x 1BHK (Carpet Area: 427sft.), 3 x 1.5BHK (Carpet Area: 527sft.). 4 refuge levels with 5 units on each level Total units in this towe: 164
Tower B
28 Floors consisting of 6 units on each floor – 3 x 1BHK (Carpet Area: 427sft.), 2 x 1.5BHK (Carpet Area: 527sft.), 1 x 2BHK (Carpet Area: 710sft.).
2 x 1BHK units start from the 2nd Podium level. Total units: 14
4 refuge levels with 4 units on each level
Total units in this tower: 174
Tower C
28 Floors consisting of 4 units on each floor – 1 x 1.5BHK (Carpet Area : 527sft.) , 1 x 2BHK (Carpet Area : 710sft.) , 2 x 3BHK (Carpet Area : 857sft.).
2 x 3BHK units start from the 2nd Podium level. Total units: 14
4 refuge levels with 3 units on each level
Total units in this tower: 122
- Available : 1 BHK 1.5 BHK and 2 BHK
- Area Covering : 685 sq. ft – 1135 sq ft
- Building Details 1 : 3 Towers of each 30 storey spread on 1.9 acres of land parcel
- Possession Date : Expected in 3.5 years
Ameneties –
- Recreation Facilities
- Basket Ball Court
- 24Hr Backup
- Gymnasium
- Security
- Club House
- Intercom
- Play Area
- Health Facilities
- Garden
- Badminton Court
- Broadband Internet
- Cafeteria
- Rain Water Harvesting
- Swimming Pool
- Maintenance Staff
- Tennis Court
- Indoor Games
Living and Dining Room:
Vitrified flooring
Extensive electrical layout
Windows with granite or marble sill
Cable point
Telephone point
AC points
Intercom Facility
BEDROOM:
Vitrified flooring
Extensive electrical layout
Windows with granite or marble sill
Cable & telephone point
AC points
STUDY ROOM:
Vitrified flooring
Extensive electrical layout
Windows with granite or marble sill
Cable & telephone point
AC points
KITCHEN:
Vitrified flooring
Granite platform with stainless stell sink
Auxiliary platform
Gas leak detector
Provision for piped gas connection
Extensive electrical layout with points for water purifier, refrigerator, exhaust and mixer-grinder
Fitted modular kitchen on Request
BATHROOMS:
Vitrified flooring
Glazed dado tiles
High quality sanitary ware & C.P. Fittings
Extensive electrical layout with point for exhaust & geyser
DOORS:
Decorative fire-rated main door
Laminated doors for bedrooms & toilets
INTERNAL WALL FINISH:
Gypsum plaster
Lustre paint in living / dining room & passage
ELECTRIFICATION:
Extensive layout in concealed copper wiring
Modular switches in flats
Provision for lights, fans & TV points with adequate extra points
SECURITY & SAFETY SYSTEM:
Intercom facility within each apartment
Gas leak detector in all kitchens
Fire alarm system
Common areas with sprinklers
DG power back-up for designated common areas & elevators
COMMON AREA AMENITIES:
High-speed passenger elevators
Designer entrance lobbies
Designated service elevators
BOOKING DETAILS
Booking amount – 2.5 Lacs
10% in one month
10% after IOD (to be paid after 3 months)
Payment Linked to construction
Related